Temporary Works

  • TEMPORARY WORKS

    • Falsework and formwork, scaffolding and back-propping design
    • Tower-crane base and piling mat design
    • Deep excavation support and propping including pile design (concrete and steel)
    • Excavation support including king post walls, cofferdams, ground anchors
    • Fa�ade retention using scaffold, proprietary systems or steel framing
    • Floor loading capacity checks for demolition and refurbishment works
    • Forming new openings and needle shoring, stooling (Pynford beams), column removal dead shoring.
  • Structural Engineering Design